01 Introduction: The Timing Question
Step 5 answers the fundamental question: "When do I recognize the allocated revenue?"
The answer impacts:
- Revenue patterns (smooth vs. lumpy)
- Contract asset/liability balances
- Key metrics (growth rates, margins)
- Working capital requirements
- Investor expectations
This guide transforms complex timing rules into practical decision tools.
02 The Master Decision: Over Time or Point in Time?
Start: Does ANY of these apply?
│
├─ 1. Customer simultaneously receives/consumes benefits as you perform?
│ │
│ └─YES→ OVER TIME ✓
│
├─ 2. You create/enhance an asset the customer controls?
│ │
│ └─YES→ OVER TIME ✓
│
├─ 3. You create an asset with no alternative use AND
│ have enforceable right to payment for performance to date?
│ │
│ └─YES→ OVER TIME ✓
│
└─ None apply → POINT IN TIME ✓Key Point: Only need to meet ONE criterion for over-time recognition!
03 Over-Time Recognition: The Three Criteria
Simultaneous Receipt and Consumption
Question: Does the customer receive and consume benefits as you perform?
- Cleaning services
- Security monitoring
- Cloud hosting/SaaS
- Transportation services
- Processing services
- Manufacturing products
- Software development (usually)
- Construction (usually)
Quick Test: If you stopped today, would another vendor need to re-do your work?
• NO → Likely simultaneous consumption
• YES → Not simultaneous consumption
Customer Controls Asset Being Created/Enhanced
Question: Are you creating or improving something the customer already controls?
- Renovating customer's building
- Upgrading customer's IT system
- Improving customer-owned land
- Customizing customer's equipment
- Building on your land
- Creating assets in your facility
- Standard product manufacturing
Control Indicators:
- Asset on customer property
- Customer directs changes
- Customer bears risk of loss
- Legal title with customer
No Alternative Use + Right to Payment
Both conditions must be met:
Practical Restriction Examples:
- Customized to customer specifications
- Customer name/logo embedded
- Contractual restrictions on redirecting
Substantive Restriction Examples:
- Significant rework costs to redirect
- No market for specialized asset
- Would incur significant loss
Must have right to payment for performance to date, including:
- Costs incurred
- Reasonable profit margin
- Enforceable in legal dispute
- Right to reimbursement of costs only
- Deposits or progress payments
- Payment only on completion
04 Measuring Progress for Over-Time Recognition
Output Methods (Preferred if Directly Observable)
Measure results directly:
- Units delivered/produced
- Milestones reached
- Surveys of work completed
- Time elapsed (for stand-ready obligations)
Example - Construction:
Building 100 apartment units
Completed: 40 units
Progress: 40%
Revenue recognized: 40% of allocated priceWhen to Use:
- Output directly observable
- Outputs have similar values
- Information readily available
05 Point-in-Time Recognition: Identifying Transfer of Control
Control Indicators (Consider All)
Common Transfer Points by Industry
• FOB destination → At delivery
• With installation → After installation
• With acceptance → After acceptance
• Physical delivery → When received
• With implementation → After go-live
• With occupancy right → When available
• With construction → Based on control analysis
06 Special Scenarios
Bill-and-Hold Arrangements
Revenue Recognition Criteria (ALL must be met):
- Substantive reason for arrangement
- Product separately identified
- Product ready for transfer
- Cannot use/direct to another customer
- Seller convenience
- Product not complete
- Can redirect to others
- No customer request
Customer Acceptance Provisions
Acceptance based on:
- Specified performance metrics
- Measurable characteristics
- Defined specifications
Treatment: Recognize when objectively met
Licensing: Quick Reference
Is it symbolic IP (brands, franchises)?
│
├─YES→ RIGHT TO ACCESS (over time)
│
└─NO→ Do your ongoing activities significantly affect the IP?
│
├─YES→ RIGHT TO ACCESS (over time)
│
└─NO→ RIGHT TO USE (point in time)- Functional IP
- Customer can use as-is
- No significant vendor activities
- Examples: Music downloads, fixed software
- Symbolic IP OR
- Functional IP requiring updates
- Vendor activities affect value
- Examples: Franchise rights, SaaS platforms
07 Contract Assets and Liabilities
Contract Asset (Unbilled Revenue)
When created: Revenue recognized > Amount billed
Example:
Month 1 construction progress: 25%
Revenue recognized: $250,000
Amount billed: $0
Contract asset: $250,000Contract Liability (Deferred Revenue)
When created: Amount billed > Revenue recognized
Example:
Annual SaaS subscription: $120,000 paid upfront
Month 1 revenue: $10,000
Contract liability: $110,000Presentation Rules
Performance complete + Unconditional right to payment = Receivable
Performance complete + Conditional right to payment = Contract Asset
Performance incomplete + Payment received = Contract Liability08 Industry-Specific Applications
Software & Technology
Common Patterns:
- SaaS: Over time (continuous access)
- Perpetual licenses: Point in time
- Implementation: Depends on criteria
- Maintenance: Over time
Key Judgments:
- PCS (support) criticality
- Implementation complexity
- Customer control points
09 Common Pitfalls and Solutions
| Pitfall | Problem | Solution |
|---|---|---|
| Pitfall 1: Assuming All Services Are Over Time | Not all services meet criterion 1 | Apply "re-performance" test |
| Pitfall 2: Ignoring Contractual Payment Terms | Assuming right to payment exists | Legal review of actual enforcement rights |
| Pitfall 3: Using Wrong Progress Measure | Input method when output available | Prioritize observable output measures |
| Pitfall 4: Missing Uninstalled Materials | Overstating progress percentage | Adjust cost-to-cost calculations |
| Pitfall 5: Premature Point-in-Time Recognition | Recognizing before control transfers | Evaluate all control indicators |
10 Key Differences: ASC 606 vs. IFRS 15
The standards are nearly identical, with minor interpretive differences:
- Both list same five indicators
- IFRS 15 may emphasize risks/rewards more
- ASC 606 may focus more on customer ability
- Same methods available
- IFRS 15 provides more examples
- Practice generally aligned
- ASC 606: Functional vs. symbolic framework
- IFRS 15: Focus on vendor activities
- Usually same conclusion
11 Implementation Toolkit
Performance Obligation: ________________
Criterion 1 (Simultaneous): □ Yes □ No
Evidence: _____________________________
Criterion 2 (Customer Control): □ Yes □ No
Evidence: _____________________________
Criterion 3a (No Alt Use): □ Yes □ No
Evidence: _____________________________
Criterion 3b (Right to Payment): □ Yes □ No
Evidence: _____________________________
Conclusion: □ Over Time □ Point in Time
Progress Method: ______________________12 Practical Examples
Custom Equipment Manufacturer
Contract: $5M custom production line
Analysis:
- No alternative use? YES (customer specs)
- Right to payment? YES (cost + 20% margin)
Recognition: OVER TIME
Method: Cost-to-cost
Calculation: Month 3: 30% complete = $1.5M revenue
SaaS Implementation
Contract: $200K license + $100K implementation
Analysis:
- License: Point in time at go-live
- Implementation: No alternative use + payment right
Recognition: Implementation over time, license at point
Method: Hours incurred / total expected hours
13 Conclusion and Action Steps
Successfully applying Step 5 requires:
- Systematic evaluation of over-time criteria
- Appropriate selection of progress measurement
- Careful analysis of control indicators
- Clear documentation of judgments
- Consistent application across similar contracts
Immediate Actions:
- Only need ONE criterion for over-time
- Both conditions needed for Criterion 3
- Consider ALL control indicators
- Document progress method rationale
- Reassess if facts change
Master the timing of revenue recognition, and you'll complete the ASC 606/IFRS 15 journey with confidence!