Practical revenue guides

The Revenue Month-End Close Checklist

Reconcile revenue schedules to the ledger, investigate differences and assemble a reviewable month-end evidence pack.

All articles

1. Fix the reporting scope and cut-off

Agree the entity, reporting period, functional currency, cut-off time, preparer and reviewer. Use a dated source extract so that the reviewer can reproduce the close rather than compare two reports taken at different times.

  • Reconcile the opening balances to the signed-off prior close.
  • Confirm all new contracts, deliveries, service starts, renewals, modifications and cancellations up to cut-off are included.
  • Reconcile invoice and credit-note registers to billing records, including late documents and failed integrations.
  • Assign each unresolved item an owner, amount, explanation and deadline. Keep a record of changes made after the initial extract.

2. Review what changed

Compare the current schedule with the prior approved version. Investigate unexpected starts, stops, negative revenue and changes to completion estimates. Reassess the relevant accounting when facts change; a billing change does not automatically determine revenue timing.

  • Inspect evidence for deliveries, customer acceptance where relevant, workshop completion and service periods.
  • Review changed obligations, transaction prices and estimates. Check that approved modifications were applied from the correct date.
  • Validate allocations, partial-period calculations, currency rates and rounding under the documented policies.
  • Review receivable and contract-asset collectibility or impairment under the applicable guidance, separately from the timing of performance.

3. Reconcile the balances

Continue the €27,000 prepaid access-and-training example. There is no opening balance, tax, foreign exchange, refund, reclassification or other movement. January revenue is €7,200 and the expected closing contract liability is €19,800.

January contract-liability roll-forward in EUR
MovementAmount
Opening contract liability€0
Advance consideration received+€27,000
Release for January performance−€7,200
Closing contract liability€19,800
  • Reconcile the schedule's monthly revenue to the revenue ledger by entity, currency and account.
  • Reconcile closing contract assets, contract liabilities and receivables to their respective ledger balances. Do not offset unrelated contracts to hide differences.
  • For real contracts, add separately explained movements for refunds, credits, foreign exchange, reclassifications and other adjustments as applicable. This example's cash-based bridge is not a universal roll-forward.
  • Compare export totals and row counts with the ledger's accepted batch totals; check rejected lines and duplicate posting identifiers.

IFRS 15, paragraphs 105–109 and 116–118 — Presentation and changes in contract balances. Related US GAAP: ASC 606-10-45 and 606-10-50-8–10. The operational checklist and reconciliation example are original illustrations.

4. Investigate a €1,800 difference

Suppose the ledger contains the advance and the €5,400 training release, but the January access journal was omitted. Ledger revenue is €5,400 and its contract liability is €21,600. The approved schedule shows €7,200 revenue and a €19,800 liability.

The documented difference is the missing €1,800 access release. After confirming January service delivery and that the entry has not already been posted in another batch, debit contract liability €1,800 and credit access revenue €1,800. Capture the approved journal and accepted posting reference, then rerun the reconciliation.

5. Complete the review and preserve the evidence

Downloading an export does not prove that it was imported or posted. Keep the ledger acknowledgement with the batch and check that a retry cannot create a duplicate. Preserve the approved close version before starting the next period.

In the example, February opens with a €19,800 contract liability. A further €1,800 release leaves €18,000 at February end. Carry that approved balance forward; do not rebuild it from an uncontrolled copy of the January spreadsheet.

Suggested close evidence pack
ItemEvidence to retain
CompletenessDated source extracts and the reconciliation to contract and billing populations
Accounting judgmentsSupporting facts, applicable references and approval of unusual treatments
Revenue and balancesVersioned schedules, movement analyses and ledger reconciliations
PostingBalanced journals, approved batch totals, accepted ledger IDs and rejected-line resolution
Sign-offPreparer, reviewer, dates and documented treatment of remaining exceptions